On June 20, witnessed by owners including China Resources Power, Inner Mongolia Energy Group and Sungrow New Energy, China General Certification Center (CGC) awarded the first batch of Site-Specific Design Assessment (SSDA) certificates for wind turbine generators to Goldwind, Envision Energy, Mingyang Smart Energy, CRRC Zhuzhou Institute and Shanghai Electric at the 5th (2025) Renewable Energy Insurance and Risk Control Innovation Forum in Dalian.

Zhang Yu, Vice President of CGC, and Du Guangping, Chief Engineer of CGC, attended the forum and presented the SSDA certificates. According to Zhang Yu, site-specific assessment is not a new concept, and many owners have already incorporated it into wind turbine bidding clauses. Nevertheless, the industry has long been plagued by inconsistent and non-standard procedures and methodologies. Relying solely on consultancy reports is cumbersome for owners, making it difficult to identify and mitigate risks.
Therefore, in compliance with the requirements for site-specific assessment under the IEC standard framework, CGC collected extensive feedback from owners and turbine OEMs including China Resources Power, Three Gorges, Goldwind, Envision, Mingyang, CRRC Zhuzhou Institute, Shanghai Electric and Windey, and developed a standardized procedure and methodology for unified certification across the industry.
This means that holding an SSDA certificate serves as evidence that the design safety of the wind turbine has been verified and complies with standard requirements under the given site conditions. Moreover, compared with lengthy assessment reports, certificates act as a standardized, clear and concise information carrier for convenient and efficient use by owners.
Shi Hao, person-in-charge of SSDA at CGC, introduced the applicable standard framework and assessment workflow for the certification. In line with relevant IEC requirements, the standardized SSDA process is as follows: on the basis of the wind turbine type certificate, assessments are carried out covering site condition evaluation, site-specific load assessment, site-specific RNA (Rotor Nacelle Assembly) design assessment, and site-specific support structure (tower and foundation) design assessment. An SSDA certificate will be issued upon satisfactory assessment results.
Going forward, CGC will further develop systematic integrated technical solutions covering certification, technical assessment, management procedures and insurance. It will continuously improve the full-lifecycle risk control mechanism for wind power equipment and wind farm projects to support the sustainable and high-quality development of China’s wind power sector.
Cao Xu, Solution Director of Goldwind; Fang Xiaoju, General Manager of Strategic Marketing at Envision Energy; Chen Baokang, Deputy Director of the Testing & Certification Department of Mingyang Smart Energy; Yao Hui, Deputy Director of the Technology Center of CRRC Zhuzhou Institute; and Lin Shengyang, Testing & Certification Supervisor of Shanghai Electric received the certificates on stage. Dr. Wei Huichun, New Energy R&D Engineer of China Resources Power Technology Research Institute; Yang Yafeng, Deputy Manager of the Electrical Center of Inner Mongolia Energy Engineering Technology Research Institute; and Wang Dujun, Senior Engineer of the Central Technology Department of Sungrow New Energy also attended the event.